Skip to content

Merge pull request #44 from IT2810-H26/server/fix-db-import #67

Merge pull request #44 from IT2810-H26/server/fix-db-import

Merge pull request #44 from IT2810-H26/server/fix-db-import #67

Triggered via push October 12, 2026 14:16
Status Failure
Total duration 17h 39m 20s
Artifacts –

ci.yml

on: push
Matrix: lint-and-test
Fit to window
Zoom out
Zoom in

Annotations

3 errors
lint-and-test (backend)
Some specified paths were not resolved, unable to cache dependencies.
lint-and-test (frontend)
The job was canceled because "backend" failed.
lint-and-test (frontend)
The operation was canceled.