Skip to content

Prosjekt-2

Prosjekt-2 #71

Triggered via pull request October 12, 2026 14:40
@albertplalbertpl
synchronize #50
dev
Status Failure
Total duration 17h 29m 9s
Artifacts –

ci.yml

on: pull_request
Matrix: lint-and-test
Fit to window
Zoom out
Zoom in

Annotations

3 errors
lint-and-test (backend)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
lint-and-test (backend)
The operation was canceled.
lint-and-test (frontend)
The job was canceled because "backend" failed.